loading

Focus on DTF & UV DTF inkjet printing solution

BF-UV6090: Printhead Installation and Calibration

Step-by-step: baseline positioning, gap adjustment, and multi-head calibration.
×
BF-UV6090: Printhead Installation and Calibration

  1. H1 baseline position – H1 serves as the baseline position and requires no independent adjustment.

  2. Carriage-to-platform clearance – Inspect and adjust the clearance between the print carriage and the platform; the standard height is 1.5–2.0 mm.

  3. Printhead vertical calibration – Loosen the left or right tensioning screws. Perform the overall angle calibration of the carriage baseplate based on the H1 printhead calibration pattern.
    Note: After adjustment, securely tighten the tensioning screws before running a second print verification.

  4. H2/H3/H4 vertical (or horizontal) physical calibration – Loosen the fixing screws. Using the tapered screws, perform the horizontal physical calibration for H2 and H3, referring to the calibration images.
    Note: Securely tighten the screws before printing the calibration chart again.

prev
Manually Adjust the Head Vertical Calibration
Replace the White Ink Circulation Pump
next
recommended for you
Get in touch with us
Choose high-quality printing solutions and work together to create a better future.
Contact Us
Contact person: Charles Hu
Tel: +86-15986617086
Email: sales@bigfootdg.com
WhatsApp: +86-15986617086
Add: 4th Floor, Unit 6, Building 11, West Area, Qingyang Street Electronics & Electrical Industrial Park, Zhongyuan District, Zhengzhou City, Henan Province, China
Customer service
detect